Interpretation of engineering drawings

Interpretation of engineering drawings is one of the subtopics of Construction Engineering in the FE Civil exam specification. Questions here are short: one scenario, four choices and about three minutes to answer with the FE Reference Handbook open beside you.

What you can be asked

These are the ideas our problems on Interpretation of engineering drawings are built around. Each one is covered by at least one problem in the bank.

  • Drawing scale and true length
  • Contour interpretation and slope
  • Section and elevation dimensions
  • Rebar callout and spacing count
  • Weld or steel shape designation (conceptual)
  • Grading plan cut or fill at a point
  • Pipe invert and slope from a profile

Our practice bank has 11 problems on interpretation of engineering drawings. 10 are calculations and 1 is a concept question with no calculation. 6 of them come with a diagram. 5 use SI units and 6 use US customary units, as the exam mixes both.

Try one: a free Interpretation of engineering drawings problem

The solution shows the steps with units, where the equation sits in the Handbook, and the mistake behind each wrong choice.

Free sample US customary units

The sewer profile shown has a straight pipe on a constant slope between two manholes. At MH-1, station 10+50, the pipe invert elevation is 846.20 ft; at MH-2, station 13+70, it is 844.60 ft. A service connection is planned at station 12+90, where the existing ground elevation is 853.40 ft. Stations are in units of 100 ft, so these three points are 1,050 ft, 1,370 ft and 1,290 ft along the line. The depth from the ground surface to the pipe invert at station 12+90 (ft) is most nearly:

Swipe the diagram sideways to see all of it.

Existing groundMH-1MH-2Ground El. 853.40Inv. El. 846.20Inv. El. 844.60Pipe (flow to MH-2)Sta 10+50Sta 13+70Sta 12+90Not to scale
  1. A6.00
  2. B7.20
  3. C8.40
  4. D8.80

Work it out first. On the exam you would have about three minutes.

Show the answer and worked solution

AnswerC8.40

Find it in the Handbook

Civil Engineering

Vertical Curves

Tangent elevation = (Handbook), applied to the pipe invert with negative for a falling pipe; depth = ground − invert

Search (Ctrl+F)

Tangent elevation

Given

  • MH-1: station 10+50, invert 846.20 ft
  • MH-2: station 13+70, invert 844.60 ft
  • Connection: station 12+90, ground 853.40 ft
  • Straight pipe, constant slope

Find

Depth from ground to pipe invert at station 12+90

  1. Pipe slope between the manholes

    Horizontal length = difference in stations: 1,370 − 1,050 = 320 ft. Fall of the invert: ft. Slope ft/ft (0.50%).

  2. Invert elevation at station 12+90

    The connection is 1,290 − 1,050 = 240 ft downstream of MH-1. On a constant slope the invert drops ft over that distance, so the invert elevation there is ft.

  3. Depth to invert

    Depth = ground elevation − invert elevation ft.

Why the other choices are wrong

  • A6.00 ft comes from adding the 1.20 ft of fall to the MH-1 invert instead of subtracting it: ft, and ft. That puts the pipe at station 12+90 higher than its upstream end. The pipe falls toward MH-2, so the invert there is ft.
  • B7.20 ft comes from using the MH-1 invert unchanged: ft. The pipe is not level. It falls ft over the 240 ft from MH-1 to station 12+90, so the invert at the connection is 845.00 ft.
  • D8.80 ft comes from using the MH-2 invert: ft. Station 12+90 is 80 ft upstream of MH-2, and there the pipe is ft higher, at 845.00 ft.

Exam-day tip

Convert stations to feet first (12+90 is 1,290 ft), and check that your interpolated invert lies between the two manhole inverts.

Practice more Interpretation of engineering drawings

The bank has 11 problems on this subtopic and 80 across Construction Engineering. Practice quizzes are part of membership. Not a member yet? The free diagnostic shows which areas to work on first. Through December 31, practice quizzes are free with a free account.