A centrifugal pump transfers cooling water from an open sump to an open elevated tank, as shown in the figure. The tank surface is 15 m above the sump surface, and both levels stay constant. Over its operating range the pump's head curve is H = 50 − 0.0040Q², and the friction and minor losses in the piping total 0.0030Q², with heads and losses in meters and Q in L/s. Velocity heads at the two free surfaces are negligible. The flow rate at the operating point (L/s) is most nearly:
Swipe the diagram sideways to see all of it.
- A70.7
- B84.5
- C93.5
- D112
Work it out first. On the exam you would have about three minutes.
Show the answer and worked solutionHide the answer and worked solution
AnswerA70.7
Find it in the Handbook
Fluid Mechanics
Centrifugal Pump Characteristics
Operating point where the pump curve meets the system curve, (standard method; the Handbook has no formula for it). The Handbook shows pump head-flow curves and the energy equation, printed without a pump term, which you extend by adding the pump head to build the system curve.
Search (Ctrl+F)
Given
- Static lift (sump surface to tank surface) m
- Pump curve ; pipe losses ( in m, in L/s)
Find
Flow rate at the operating point, in L/s
System curve
The pump must lift the water 15 m and overcome the losses: .
Set pump head equal to system head
, so .
Solve for Q
L/s, closest to 70.7 L/s.
Why the other choices are wrong
- B84.5 L/s comes from leaving out the 15 m static lift, . The pump must raise the water 15 m as well as overcome friction, so the system curve starts at 15 m: gives 70.7 L/s.
- C93.5 L/s comes from setting the pump head equal to the static lift alone, , which ignores the pipe losses. Add the loss term to the system side to get 70.7 L/s.
- D112 L/s is where the pump curve reaches zero head, . A pump at zero head cannot lift water 15 m; the operating point is where the pump and system curves cross, 70.7 L/s.
Exam-day tip
After finding the operating flow, put it back into both curves: they must give the same head. That ten-second check catches a dropped static head or a sign error.