Maintenance records for a CNC lathe show its unplanned downtime per day: 0 h with probability 0.50, 1 h with probability 0.25, 2 h with probability 0.15, and 4 h with probability 0.10. Each hour of downtime costs the plant $160 in lost production. The expected daily cost of unplanned downtime ($) is most nearly:
- A38
- B152
- C187
- D280
Work it out first. On the exam you would have about three minutes.
Show the answer and worked solutionHide the answer and worked solution
AnswerB152
Find it in the Handbook
Engineering Probability and Statistics
Expected Values
Expected value of a discrete random variable,
Search (Ctrl+F)
Given
- Downtime : 0, 1, 2 and 4 h with probabilities 0.50, 0.25, 0.15 and 0.10
- Lost production $160 per hour of downtime
Find
Expected daily downtime cost,
Expected downtime
h per day.
Expected cost
per day.
Why the other choices are wrong
- A$38 is the correct weighted sum, $152, divided by the 4 outcomes. The probabilities already do the averaging; dividing again treats a weighted average as if it were a simple sum. The expected cost is .
- C$187 multiplies the chance of any downtime, 0.50, by the simple average of the nonzero downtimes, h, then by $160. The three downtimes are not equally likely; weight each by its own probability: h and the cost is $152.
- D$280 is the simple average of the four possible downtimes, h, times $160. That ignores that a day with no downtime is far more likely than a 4 h day. Use h, giving $152.
Exam-day tip
Before using the probabilities, add them: they must total 1. If they do, a probability-weighted sum is already the average; do not divide it by the number of outcomes.