Skip to content

Free in December. Through December 31, every feature for every exam is free with a free account. No plan, no card.

Free through December 31. Every feature for every exam, free with an account. No plan, no card. Create a free account

Free through December 31. Your account has every feature for every exam until then.

Mix design of concrete and asphalt

Mix design of concrete and asphalt is one of the subtopics of Materials in the FE Civil exam specification. Questions here are short: one scenario, four choices and about three minutes to answer with the FE Reference Handbook open beside you.

What you can be asked

These are the ideas our problems on Mix design of concrete and asphalt are built around. Each one is covered by at least one problem in the bank.

  • Absolute volume method
  • Water-cement ratio and strength
  • Aggregate moisture correction
  • Yield and cement factor
  • Air content
  • Asphalt air voids
  • Voids in mineral aggregate
  • Voids filled with asphalt
  • Bulk and maximum specific gravity of a mix

Our practice bank has 15 problems on mix design of concrete and asphalt. Every problem is a calculation with a numeric answer. 10 use SI units and 5 use US customary units, as the exam mixes both.

Try one: a free Mix design of concrete and asphalt problem

The solution shows the steps with units, where the equation sits in the Handbook, and the mistake behind each wrong choice.

Free sample SI units

A concrete mix is proportioned by the absolute-volume method for a batch volume of 1 m³. The batch contains 350 kg of portland cement (specific gravity 3.15), water at a water-cement ratio of 0.45 by mass, 1,050 kg of coarse aggregate (specific gravity 2.68) and 5% entrained air by volume. Aggregate masses are for the saturated surface-dry (SSD) condition and the aggregate specific gravities are bulk SSD values. If the fine aggregate has a specific gravity of 2.64 and fills the remaining volume, the required mass of fine aggregate (kg) is most nearly:

  1. A765
  2. B897
  3. C1,048
  4. D1,180

Work it out first. On the exam you would have about three minutes.

Show the answer and worked solution

AnswerA765

Find it in the Handbook

Materials Science/Structure of Matter

Concrete

Absolute-volume balance: the absolute volumes of cement, water (from by weight), aggregates and air add up to the batch volume, with (standard method; the Handbook has no formula for it)

Search (Ctrl+F)

Water-cement (W/C) ratio

Given

  • Batch volume m³
  • Cement: kg,
  • Water-cement ratio (by mass)
  • Coarse aggregate (SSD): kg,
  • Air content 5% of the batch volume
  • Fine aggregate (SSD):
  • Density of water kg/m³

Find

Mass of SSD fine aggregate,

  1. Find the water from the water-cement ratio

    The water-cement ratio is a ratio of masses, so kg. Water has a specific gravity of 1, so it occupies m³.

  2. Convert the other known ingredients to absolute volumes

    The absolute (solid) volume of an ingredient is its mass divided by its own density, . Cement: m³ Coarse aggregate: m³ Air is specified directly by volume: m³

  3. Give the remaining volume to the fine aggregate

    All the absolute volumes must add up to the batch volume, so the fine aggregate takes what is left: m³.

  4. Convert that volume back to mass

    kg.

Why the other choices are wrong

  • B897 kg comes from leaving the 5% air out of the volume balance: the fine aggregate is then given m³, and kg. Entrained air takes up 0.050 m³ of the batch even though it has no mass, so subtract it as well.
  • C1,048 kg comes from treating as a ratio of volumes: water volume m³, which leaves 0.3971 m³ for the fine aggregate, and kg. The ratio is by mass: the water is kg, which occupies 0.1575 m³.
  • D1,180 kg comes from leaving the water out of the volume balance: m³, and kg. The water is not listed as a mass in the stem, but it is in the batch: find it from (157.5 kg, 0.1575 m³) and subtract its volume too.

Exam-day tip

Set up a small table with one row per ingredient (cement, water, coarse aggregate, air, fine aggregate) and a volume column that must total the batch volume. Air and water are the two rows people forget.

Practice more Mix design of concrete and asphalt

The bank has 15 problems on this subtopic and 47 across Materials. Practice quizzes are part of membership. Not a member yet? The free diagnostic shows which areas to work on first. Through December 31, practice quizzes are free with a free account.

More in Materials