Free sample
Marcus Oyelaran, PE, owns a small structural engineering firm. Tallgrass Homes, a home builder, emails him a finished set of foundation drawings produced by the builder's own unlicensed drafter and offers a flat fee if he will "review and stamp" them by tomorrow. Marcus had no part in preparing the drawings. Which response is consistent with the NCEES Model Rules and the Model Law definition of responsible charge?
- ASeal the drawings after a brief review, because reviewing them makes him the engineer of record.
- BSeal the drawings and add a note stating that he is not liable for work done by the builder's drafter.
- CDecline to seal the drawings as offered; seal only work prepared under his own direction and control, for which he accepts full responsibility.
- DHave the builder's drafter sign the drawings and place his own seal on the cover sheet only.
Work it out first. On the exam you would have about three minutes.
Show the answer and worked solutionHide the answer and worked solution
AnswerCDecline to seal the drawings as offered; seal only work prepared under his own direction and control, for which he accepts full responsibility.
Find it in the Handbook
Ethics and Professional Practice
Responsible Charge
Model Rules 240.15 B.2 (no seal on a document not prepared under your responsible charge), with the Model Law 110.20 E definition of Responsible Charge
Search (Ctrl+F)
Given
- Completed drawings prepared by an unlicensed person outside the engineer's firm
- The engineer had no involvement while the work was developed
- He is asked to seal after a quick review for a flat fee
Find
The response that satisfies the rules on sealing and responsible charge
What a seal means
A seal tells the public that a licensee stands behind the work. The rules on obligations to employers and clients bar a licensee from sealing any document that was not prepared under that licensee's responsible charge.
Test the facts against responsible charge
Responsible charge means real control: authority to review and to change, reject or approve the work while it is being developed, personal knowledge of the project's scope and requirements, the ability to answer for the engineering decisions, and acceptance of full responsibility. A next-day look at finished drawings made by someone he did not direct meets none of the control requirements.
Consequence of sealing anyway
Sealing work not prepared under one's responsible charge is itself listed among the grounds for board discipline, and a disclaimer note or a cover-sheet-only seal does not change who is answerable. The compliant response is to decline, or to take the project on properly and direct the work himself before sealing.
Why the other choices are wrong
- AThis assumes that reviewing finished drawings puts him in responsible charge. Model Law 110.20 E requires authority to review and to change, reject or approve the work throughout its development, plus personal knowledge of the project; a brief look afterward gives neither. Rule B.2 bars sealing work not prepared under his responsible charge, so he declines.
- BA disclaimer cannot be combined with a seal. Accepting full responsibility for the work is one of the four requirements of responsible charge, so a note refusing liability for the drafter's work admits that the drawings were not prepared under his responsible charge. Rule B.2 then bars the seal.
- DMoving the seal to the cover sheet does not change who prepared the drawings: the seal still presents the set as work under his responsible charge, and the drafter is unlicensed, so the drafter's signature certifies nothing. Rule B.2 bars sealing any plan not prepared under his responsible charge, in whole or in part.
Exam-day tip
"Review and stamp" is the classic plan-stamping scenario. If the licensee did not direct and control the work as it was produced, the answer is not to seal it.